When the plan has been carried out, but production is still losing efficiency.
Achieving 100 percent of the production plan appears to be a good result. But this figure alone does not reveal the cost at which the company achieved it.
The production plan may be met within a month—yet some of the products were produced only in the final days of the period. The total volume meets the plan, but certain product types remain in short supply. Orders have been fulfilled, but some were delivered late. Output is growing—and with it, defects and the cost of production for certain product groups are rising.
At the level of the final KPI, production appears stable. At the process level, however, deviations are already accumulating, which subsequently affect deadlines, costs, and financial results.
Therefore, the key question for a production manager is not “Did we meet our target?” but “How did we achieve this result—and where is risk already building up?” This is precisely what production analytics should address: not merely recording facts, but identifying the causes of deviations before they impact the overall result.
What business issues should a production analysis cover?
A single metric reflects a result. To make a management decision, it is necessary to understand what lies behind that metric and how it relates to other process parameters.
| Focus of the Analysis | What You Need to Understand | For which solution |
| Progress Toward the Plan | Where has the plan been met or exceeded, and where are the actual figures below the plan? | Identify shortcomings and adjust production priorities |
| Rhythm | How consistently are products manufactured during this period? | To see the instability of the process that the final result hides |
| Deadlines | What percentage of orders were completed on time, ahead of schedule, or behind schedule—and by how many days? | Monitor production discipline and the risk of delays |
| Quality | Where does the actual defect rate exceed the acceptable limit, and which products or sections show the greatest deviations? | Identify problem areas and set priorities for quality assurance efforts |
| Cost of Goods Sold | How have the cost of goods and product groups changed compared to previous periods? | Monitor negative trends in production costs |
| Forecast | Given the current trend, what will the expected plan fulfillment rate be at the end of the period? | Take action to address the risk of falling short of the target before the end of the reporting period |
These issues vary in complexity. The company’s overall performance may be on track, while a specific production unit consistently falls short of its targets, a particular product line shows rising production costs, and the proportion of delayed orders is gradually increasing.
The next step is to move from the overall fact-based plan to the structure of the results and understand exactly what the final 100% represents.

The overall percentage of plan fulfillment reflects the general result but may mask significant deviations within the production program. The enterprise as a whole meets its target volume, even though some products are produced below target, certain departments consistently fail to meet their quotas, and overachievement in other areas offsets this discrepancy in the overall figure.
Therefore, the question “Has the plan been fulfilled?” should be broken down into at least several criteria:
This level of detail changes the very nature of the management issue. Instead of asking, “Has the overall plan been met?” the manager receives an answer to a more practical question: “How was this result achieved—and where is the unmet production target?”
Let’s consider an example. At the end of the month, the company met its production target by 101 percent. However, one of the key product groups met its target by only 87 percent, while another met it by 116 percent. At the company level, this variance is virtually imperceptible, but at the product line level, there is already a clear shortage of specific product types.
The preconfigured “Production Analysis” BI solution allows you to monitor planned versus actual performance both at the enterprise level and broken down by individual workshops, finished goods, work-in-progress, and production orders—and to identify variances that are lost in aggregated metrics.
However, even a detailed actual-versus-plan analysis does not show how production evolved over the period, leading to the final result. To do this, it is necessary to assess the consistency of output and adherence to deadlines.
Meeting a monthly plan and meeting it at a steady pace throughout the month yield different results from a management perspective. If a significant portion of the volume is concentrated in the final days of the period, the final 100% figure does not reflect how consistently the production process operated.
To assess this stability, it is important to consider the regularity coefficient, the percentage of days on which the plan was exceeded, and the daily production trends. This allows you to identify production areas or product groups where deviations recur, and where plan fulfillment depends on sharp spikes in production at the end of the period.
Another aspect is timing. Here, it is not only the fact that a production order was fulfilled that matters, but also exactly when it was fulfilled: on time, ahead of schedule, or behind schedule. Analyzing deviations in days and the percentage of orders fulfilled exactly on time allows us to distinguish isolated delays from systemic problems.
The same 100-percent plan fulfillment can indicate different levels of process quality: either stable production in accordance with the schedule or the elimination of a backlog that had accumulated in the last few days of the month.
It is at this level that bottlenecks become apparent: not where an indicator deviated once, but where underperformance, irregular output, or missed deadlines recur for a specific product, order, or in a particular section.
For a manager, this provides the basis for setting priorities: determining which deviations require immediate intervention and which do not have a significant impact on the fulfillment of the production plan as a whole.
The overall defect rate may remain within acceptable limits while still concealing a problematic batch or group of products. If some products are consistently manufactured with minimal defects, their performance improves the average—even if the acceptable defect rate is regularly exceeded for other items.
Therefore, for quality management, it is important to move from an overall metric to the structure of defects: assess their volume and proportion, compare the actual value with the acceptable limit, and determine which products, production areas, or product types cause the greatest deviation.
Particular attention should be paid not only to the maximum value but also to the recurrence of deviations. A one-time exceedance may be an isolated incident. A consistent exceedance of the acceptable level for a single product or in a single section already indicates an area that should be investigated in greater detail.
Let’s consider a hypothetical example: two products have the same current defect rate—2 percent. However, for one product, this represents 2 percent of a small production volume, while for the other, it represents 2 percent of a group that accounts for a significant portion of the production program. The same percentage hides different scales of potential losses.
This analysis helps us move from the question “What is our defect rate?” to a more practical one: “Where exactly are losses occurring—and in which areas would reducing them have the greatest impact on production results?”
The next step is to assess the financial aspects of production: how the cost of goods manufactured is changing and which variances require immediate attention.
A rise in production costs does not always mean that production has become less efficient. Similarly, a stable average value does not necessarily indicate that there are no problems. To make a management decision, it is important to understand which product lines are experiencing changes, how significant those changes are, and whether they are sustainable.
Two products may have the same current cost of production but different trends: for one, the figure remains stable, while for the other, it is steadily rising. The current value is the same, but the management signal is different.
That is precisely why cost analysis should not be based on a single average figure, but should instead evaluate:
This type of analysis helps identify products for which negative trends have not yet had a critical impact on the overall indicator but already require attention. Conversely, it helps distinguish sustained increases in cost of goods sold from short-term fluctuations.
Trend analysis allows you to identify deviations—to determine when and for which product types the cost of goods sold has changed—and to focus further analysis on specific problem areas.
When the product lineup consists of dozens or hundreds of items, another question arises: which of the identified deviations are truly the most significant for the overall result?
The management challenge is to determine which of these have the greatest impact on production results and require priority attention.
To this end, several approaches can be used in production analytics:
As a result, the manager receives not a long list of deviations, but a framework for analyzing them: which items carry the most weight in production, where targets are consistently missed, and which changes persist when periods are compared correctly.
Simply detecting an anomaly isn’t enough. It’s important to quickly determine where it originated and what caused it.
The preconfigured “Production Analysis” BI solution consolidates key production metrics into a single environment and allows users to drill down from the enterprise level to a specific shop floor, product, or order.
As a result, managers gain a basis for taking specific actions: adjusting production priorities, investigating problem areas, and assessing quality or cost trends.
Effective production management isn’t about achieving 100% on a report; it’s about understanding the cost of that result and identifying where you can influence it before the end of the period.